We always finish post-renovation cleaning in a single day. The team arrives in the morning and works until the job is done, not until the end of a shift.
As a rough guide: a one-room flat of up to 40 m² takes about five to seven hours, a two-room flat of 60–70 m² takes eight to ten, and a house or a large flat from 120 m² takes a full working day for a team of three or four people. Windows, the oven and the inside of kitchen cabinets add an hour or an hour and a half each.
The condition of the place matters. If the builders removed the heavy waste and swept the floor, the work goes faster. If sacks of mix and offcuts of plasterboard are lying around, the first hours go on clearing rather than cleaning.
You do not have to be there the whole time: open the door, and we can return the keys afterwards for UAH 499.